StockPrompt.ai Research guide

NTPC Stock Analysis 2026: Is a 43% P/E Discount Cheap, or a Fair Price for Low Returns?

NTPC stock analysis 2026: P/E of 10.3x and PAT up 40.7%, but renewables are 13.5% of capacity. See model levels, risks and what to watch.

8 min read

NTPC’s Q2 FY27 consolidated profit jumped 40.7% year-on-year to ₹7,351 Cr, yet the share sits at ₹315.45, about 10% below its 200-DMA. This NTPC stock analysis 2026 uses StockPrompt.ai data as of 24 Nov 2026, with a P/E of 10.3x against an industry P/E of 18.09x. Renewables are the largest growth lever, but at 13.5% of capacity they are still a small share of earnings. Management cites strong demand and a 36.9 GW pipeline, but price momentum is weak. Verdict: neutral and sideways with value support, scoring 58/100.

Recent results: profit up 40.7%

Q2 FY27 was a strong quarter. Consolidated revenue rose 21.2% and profit after tax 40.7% year-on-year, and a ₹3 interim dividend was declared (payable from 25 Nov, with the record date of 6 Nov already passed).

Quarter Revenue (₹ Cr) PAT (₹ Cr) Operating margin
Q2 FY27 (Sep 2026) 54,270 7,351 28.8%
Q1 FY27 (Jun 2026) 50,741 6,896 32.0%
Q4 FY26 (Mar 2026) 49,686 10,615 17.1%
Q3 FY26 (Dec 2025) 45,846 5,597 31.8%

Margins swing between quarters. Q4 FY26 was 17.1%, against 28.8–32.0% in the next two quarters, while trailing operating margin is about 27% and the employee cost ratio about 4%.

H1 FY27 group PAT was ₹14,247 Cr, up 25.7%. Standalone Q2 profit grew a slower 14.3%, so the faster consolidated growth reflects subsidiaries, including renewables.

Bar and line chart of NTPC quarterly revenue, PAT and margins, showing Q2 FY27 revenue of ₹54,270 Cr and PAT of ₹7,351 Cr

Quarterly trend chart. Source: StockPrompt.ai.

Over the latest year, revenue was ₹2,00,543 Cr (+7.0%) and net income ₹30,459 Cr (+10.6%). For more on reading results, see our guide to quarterly results.

Growth drivers: capacity, coal and renewables

Capacity growth is the main driver, and renewables are the largest lever inside it. Management said power demand grew 15% in H1 FY27, and group generation rose 10.4% to 236 BU.

Capacity metric Mar 2023 Mar 2024 Mar 2025 Mar 2026
Group installed capacity (MW) 72,254 74,638 79,930 89,108
Renewable capacity (MW) 3,204 3,528 6,840 12,068
Coal PLF, standalone (%) 75.10 77.25 77.44 72.04

Renewables were 13.5% of group capacity at Mar 2026. They grew 76% in FY26 and are 3.4x their Mar 2024 level. Group capacity was 91.5 GW at 30 Sep 2026, up 9.1% year-on-year.

The pipeline is large. The group has 36,899 MW under construction: 17,320 MW of coal, 15,998 MW of renewables (43%) and 3,581 MW of hydro. NTPC NVVN’s first 250 MW / 500 MWh battery storage project is commercial.

Management’s ambitions go further: 149 GW of total capacity and 60 GW of renewables by 2032, 244 GW by 2037, about ₹16.86 lakh crore of capex through FY37 and about 30 GW of nuclear by 2037. Guided additions are 9.6 GW in FY28 and 10.9 GW in FY29. These are ambitions, not committed schedules.

Thermal efficiency also helps. H1 FY27 coal PLF was 75.11%, against 68.35% for the rest of India, and captive coal output was 47.88 MMT in FY26, roughly double FY23. Regulated equity of ₹1,20,319 Cr (+10.6% in FY26) supports earnings visibility.

The biggest weakness: returns and leverage

Returns and leverage are the weak spot, and they explain part of the valuation discount. ROCE is only 8.9%, D/E is 1.31x and interest cover is 3.0x.

Free cash flow of ₹6,895 Cr looks thin against a heavy capex programme, and three-year revenue CAGR is just 2.1%. Total debt is ₹2,67,258 Cr.

Renewables add capacity much faster than profit. NTPC Green’s Q2 profit was ₹137.5 Cr (+56%), about 1.9% of group Q2 profit of ₹7,351 Cr, and its ROCE is 3.56%.

Valuation versus peers

NTPC is cheap against most peers, and the model rates its fundamental valuation “undervalued”. P/E is 10.29x against an industry P/E of 18.09x, a discount of about 43%, and sits in the 17th percentile of peers.

Company P/E
NLC India 8.0x
NTPC 10.3x
JSW Energy 39x
NTPC Green 105.6x
Adani Green 117x
Peer median 19.2x

Bubble chart plotting NTPC and power-sector peers by P/E and ROCE, showing NTPC with a 10.3x P/E and 8.9% ROCE in the quality-at-reasonable-value zone

Peer positioning chart: valuation versus quality. Source: StockPrompt.ai.

NTPC ranks first on quality among the peers, with ROCE of 8.9% against a 7.8% median. Its quarterly profit growth of 38.7% ranks sixth of seven, against a 54.3% median. For peer reads, see our Adani Green and JSW Energy analyses.

Other markers are low too: EV/EBITDA 9.2x, P/B about 1.4x, an earnings yield of 9.7%, a PEG of 0.52 and a dividend yield of 2.82%. A third-party estimate of 14–20% FY27 profit growth would imply a forward P/E of about 9.4–9.9x, which is illustrative only. The discount would need renewable profit and returns to rise before it narrows.

Technical view and model levels

The chart is weak. The share closed at ₹315.45 (−1.88%) in the 23 Nov session, after an open of ₹322.90, a high of ₹323.70 and a low of ₹314.85, and sits 22.7% below its 52-week high (range ₹298–₹410.20).

Daily candlestick chart of NTPC with 20-day and 50-day moving averages and Bollinger Bands, showing a peak in spring followed by a decline

Price chart with moving averages and Bollinger Bands. Source: StockPrompt.ai.

The price is below both the 50-DMA and the 200-DMA (about 10–11% below the latter), and 63-day relative strength is −7.6% against the benchmark. ADX is 17.6, which signals a weak trend, RSI is about 46–47 and MACD is bullish. Parabolic SAR is bearish at ₹332.22, and the nearest Fibonacci level is 78.6% at ₹322.01.

The model-computed levels below are for education only, over a horizon of about 63 trading days.

Model level (education only) Value
Favourable zone ₹307.16–₹312.69
Base upside level ₹329.26 (+4.4%)
Bull upside level ₹336.17 (+6.6%)
Risk level ₹294.73 (−6.6%)
Bear scenario level ₹298.18
Reward-to-risk at current price 0.67:1 base, 1.00:1 bull
Reward-to-risk near favourable zone 1.27:1 base, 1.73:1 bull

At the current price reward-to-risk is unfavourable, and it improves only near the lower zone. The near-term score is 60/100 with a neutral bias. Read together, value is supportive but momentum is not, which is the practical takeaway of this NTPC stock analysis 2026.

Risks and what to watch

The biggest near-term risk is transmission curtailment. FY27 capacity additions were cut to about 8 GW from 9.5 GW, and NTPC has filed CERC petitions on curtailment compensation and a dispute with the central transmission utility.

  • Leverage and returns (high): D/E of 1.31x, interest cover of 3.0x and ROCE of 8.9%.
  • Price momentum (moderate): the stock is in a downtrend and FIIs are net sellers.
  • Regulatory (moderate): routine CERC tariff and true-up matters, a review petition against KSEB reserved for orders, and a pending Madras High Court challenge to certain regulations.
  • Execution (moderate): management’s 60 GW renewable ambition for 2032 is about 5x the Mar 2026 level of 12.07 GW. Management says these are ambitions, not committed schedules.

Sector context is mixed: brokers see a valuation-reset opportunity after the correction in power stocks, but renewable transmission curtailment persists.

Searches found no material unresolved enforcement action. Promoters hold 51.10% with no pledge, FIIs 15.79% (−0.51 pp), DIIs 29.86% (+0.42 pp) and the public 3.23% as of Sep 2026.

Shareholding chart of NTPC as of September 2026: promoter 51.10%, FII 15.79%, DII 29.86% and public 3.23%

Shareholding composition, Sep 2026. Source: StockPrompt.ai.

Key monitorables:

  • Renewable commissioning pace against the cut FY27 addition of about 8 GW, and resolution of transmission connectivity delays.
  • Coal PLF (75.1% in H1 FY27, against 72.04% in FY26) and regulated equity growth.
  • Net debt, interest cover and funding of the capex programme.
  • NTPC Green’s profit contribution and ROCE, plus FII flows and a price reclaim of the 200-DMA.

Conclusion

NTPC is priced like a utility with a renewable option attached. The market is paying for the thermal fleet and regulated returns, not yet for the green leg.

For this NTPC stock analysis 2026, the open question is whether renewable profit and returns can rise fast enough to narrow the discount. For now, cheap multiples and a 2.82% dividend yield sit beside weak momentum and thin returns. Follow the quarterly results and run your own checks with StockPrompt.ai’s research features on any NSE or BSE stock.

Try this on StockPrompt.ai

Prompt used:

NTPC Stock Analysis 2026: Can Renewable Energy Expansion Transform Its Growth Story?

Paste any NSE or BSE stock into StockPrompt.ai and ask the same question to get factor scores, peer comparison, model levels and risks in one report.

Frequently Asked Questions

Is NTPC undervalued?

The model rates its fundamental valuation “undervalued”. P/E is 10.29x against an industry P/E of 18.09x, about a 43% discount, though ROCE of 8.9% and leverage explain part of it.

How much of NTPC’s capacity is renewable?

Renewables were 13.5% of group capacity at Mar 2026 (12,068 of 89,108 MW). They make up 43% of the 36,899 MW under construction.

What are the model levels for NTPC?

For education only, the favourable zone is ₹307.16–₹312.69, the risk level is ₹294.73, and the base and bull upside levels are ₹329.26 and ₹336.17 over about 63 trading days.

Disclaimer: This is AI-generated analysis for educational purposes only. AI can make mistakes, so verify all data independently. It is not SEBI-registered investment advice. Consult a SEBI-registered advisor before making investment decisions.
Sources: Company filings and exchange announcements, Q2 FY27 earnings-call coverage, regulatory hearing records, financial news reports, company financials and peer comparison data, and StockPrompt.ai model analytics (data as of 24 Nov 2026).